Projects

SIGNIFICANT DEVIATIONS, SHODDY WORK CAUSED M1 BRIDGE COLLAPSE

06 December 2019

Murray & Roberts Construction (MRC) left out
significant sections of the temporary structure over the M1 highway it
constructed in Sandton in October 2015 – and the parts it did construct showed
poor workmanship.

This resulted in a weakened structure that was
unable to withstand the wind and collapsed, with 120 tons of steel crashing
down onto the afternoon traffic at around 15:25 on October 14.

These are among the findings of an inquiry by the
Department of Labour (DoL) into the disaster.

The department would not make the report public,
but provided copies to the implicated parties. The report did however become
available after the Johannesburg Development Agency (JDA), which appointed MRC
to build the pedestrian bridge over the highway, made it available to Rapport
newspaper.

The inquiry contains recommendations to the
National Prosecuting Authority to prosecute MRC, the JDA and scaffolding supplier
Form-Scaff, as well as Nemai Consulting, a health and safety consultancy
appointed by the JDA to ensure health and safety compliance on site.

The listed Murray & Roberts group has since
sold MRC, but retains any liability in relation to the event. It said in an
announcement to shareholders that it does not agree with some of the
department’s findings, but would not comment any further.

The JDA also stated that it does not agree with
findings in relation to itself, and is seeking legal advice.

The report shows that in terms of its contract with
the JDA, MRC was supposed to appoint an engineer to design the temporary works.
It failed to do so, and used Form-Scaff’s general arrangement drawings instead.

These drawings were however only aimed at determining
the quantities of elements for Form-Scaff’s costing of the job. They did not
contain any calculations with regard to the loads the structure would be able
to withstand, and no sequence planning done for the construction was done.

Even so, MRC’s construction deviated significantly
from the “design”.

Some of these deviations include:

  • Large
    sections of scaffolding were left out on the eastern and western side, and in
    the sections that were erected, a large number of vertical diagonal supports
    were omitted.
  • On the
    median for example, only 12 of 33 vertical diagonals were installed. The whole
    structure basically rested on this median support.
  • The
    construction of a permanent pylon on the eastern side and a pier on the western
    side that were incorporated in the Form-Scaff drawings had not yet started.
  • During
    the inquiry it came to light that a total of 96 bolts meant to hold the
    components together were omitted.

Where the elements were erected, the couplings were
not properly tightened, the inquiry found.

The Form-Scaff drawings complied with the design
codes and, if fully erected, would have been strong enough to withstand a wind
speed of about 38 metres per second (m/s).

Due to the deviations, however, the structure
collapsed in a wind with peak gust speeds of 15-24 m/s.

The report also revealed that MRC appointed a
candidate engineer with many other responsibilities as site engineer. Oliver
Aadnesgaard was supposed to work under supervision of a registered engineer,
but did not.

Fateful
decision

During the hearings Aadnesgaard refused to disclose
who made the decision to reopen the road for traffic, for fear of incriminating
himself. The report indicates that he might have taken the fateful decision
himself, without first inspecting the structure or doing a risk assessment.

Hein Pretorius, MRC’s contracts manager, was not a
registered engineer and had no experience of bridge construction, the report
found.

Aadnesgaard and Pretorius both had inadequate
knowledge of health and safety legislation.

Nemai Consulting’s representative Roxana le Roux
noted lapses in health and safety practices on site, but failed to stop
construction to ensure compliance, the inquiry found. She was not registered
with the professional body for health and safety practitioners.

Attorney Willem le Roux of ENSafrica, who specialises in health and safety matters and represented the JDA, says that although the department stopped short of recommending the prosecution of any individuals, the NPA is not bound by the department’s recommendations and can use its own judgement in the regard.https://www.moneyweb.co.za/news/south-africa/significant-deviations-shoddy-work-caused-m1-bridge-collapse/